Most — if not all — of the projects where I provide design and construction support have some type of condensate that needs to be discharged in some manner.
Procurement and labor challenges for mechanical and electrical installations persist in today’s construction market and seemingly have a stronger grip as we move through 2023.
On a recent weekend, I was catching up on the news and goings-on when I came across this article published on the front page of a well-known national newspaper that caught my eye: “PVC pipes are called a health hazard.” In the back of my mind, I thought “wait, what?!”
In larger domestic hot water applications, we often see centralized water heating lineups with or without storage tank equipment to produce and distribute domestic hot water inside buildings and facilities. I often see these more robust systems in healthcare projects, numerous hospitality (hotel) projects as well as some multifamily installations when energy metering is not required for hot water serving the units (apartments).
There are some amazing builders in our industry that I’ve been fortunate to work with — men and women who lead teams with great success while at the same time building great leaders beside them.
The construction industry is always evolving, whether it be the technology we use to design and model the buildings and systems we install or even the way we execute the work. The mechanical and electrical system installations today are often more complex, and the more you can plan and prepare for your project installations, the likelihood of success is exponential.