During the past decade, an ongoing debate over life safety benefits versus water regulations has developed between the fire protection community and the local water authorities.
The Modern Engineering Concepts for Hydronic Heating Design seminar series, sponsored by BNP Media and presented by John Siegenthaler, P.E., began this week in Chicago with a full house.
Although chlorinated polyvinyl chloride (CPVC) pipe and fittings have more than a 40-year proven service history, their use in high-rise applications has increased significantly only in recent years.
When you operate a fleet of 32 delivery trucks year-round in upstate New York, you have some decisions to make regarding how to start those diesel engines when the outside temperature is -15
The Palmer House Hilton needed to replace its cooling tower and called on Team Mechanical Inc. (TMI) to aid the purchasing and installation of the tower onto the roof of the 24-floor hotel.
Recently, Harry Teige, maintenance director at Cambridge at Carillon Club House in Plainfield, IL, looked into finding a different and better way to treat the facility's water problems.
The new emergency room of Kaiser Permanente hospital in Walnut Creek, CA, features the latest in high-tech equipment, including decontamination units for a major chemical spill or bioterrorist attack.