Ashland Pump’s new AGP-HC200 grinder pump features a proven radial portion that grinds waste into fine slurry, and the cutting-edge axial portion cuts and chops stringy solids and other forms of non-human waste into pieces small enough to pass through the small diameter discharge pipe, Ashland Pump states.
The Lubrizol Corp., in partnership with Genova Products, expands its line of cost-effective and easy-to-install FlowGuard Gold pipes and fittings with the addition of the new FlowGuard MultiPort, the company reveals.
Towle Whitney’s over/under design (16”x34” footprint) is a problem-solver for clients with limited space, especially when retrofitting office and multifamily buildings.
Uponor’s Radiant Rollout Mat is the ideal solution for faster, more consistent installations for large commercial radiant heating and cooling applications — saving up to 85% in installation time, the company points out.
When I look at any replacement hydronic boiler project, my tenet is always to assume the existing system is installed improperly. I like to pretend I am a famous detective, such as Sherlock Holmes, and my job is to uncover the hidden mistakes.