This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies
By closing this message or continuing to use our site, you agree to our cookie policy. Learn More
This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
PM Engineer logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
PM Engineer logo
  • Home
  • Magazine
    • Current Issue
    • Digital Edition
    • Archives
    • Radiant & Hydronics Report
    • Green Plumbing & Heating
    • Fire Protection & Design Special Section
    • NSF Design Special Section
    • Radiant Comfort Guide
    • PVF Outlook
    • Ad Index
  • Market Sectors
    • Green Plumbing
    • Green Mechanical Systems
    • Codes
    • Fire Protection
    • Radiant/Hydronics
    • Solar Thermal/Geothermal
    • Bath & Kitchen
    • Water Treatment
    • Technology
  • eNewsletter
    • Supply House Times e-news
    • pme eNewsletter Archives
    • Radiant & Hydronics eNews Archives
    • Bath & Kitchen Pro eNews Archives
    • Western Plumbing News Archives
    • Subscribe to Plumbing Group eNewsletters
  • Columnists
    • Julius Ballanco on Codes
    • Editor's Note
    • John Siegenthaler: Renewable Heating Design
    • Dan Holohan: Heating Help
    • Ray Wohlfarth: The Boiler Room
    • Jacqueline Wilmot: Fire Protection
    • Christoph Lohr: Professional Development Pipeline
    • Ethan Grossman: Water Cooler Conversations
    • Blog
  • Multimedia
    • PME AHR Expo 2019 Videos
    • pme Network Videos
    • eBook
    • Interactive Spotlights
    • Photo Gallery
    • Podcasts
    • Webinars
  • Products
  • More
    • History of Plumbing
    • Industry Calendar
    • Custom Content & Marketing Services
    • Classified Ads
    • Market Research
    • Bookstore
    • Continuing Education
  • Directories
    • B.I.G. Book
    • Rep Locator
  • Contact
    • Contact Us
    • Advertise
    • Editorial Submission Guidelines
Home » Two-pipe system
Ray Wohlfarth: The Boiler RoomRadiant/Hydronics

Two-pipe system

How to control such a system during the shoulder seasons.

wolfarth slide 1

One of the systems with the most comfort complaints is a two-pipe system, which uses a supply pipe and a return pipe. Photo credit: Ray Wohlfarth.

wolfarth slide 2

Using standard boilers with a three-way valve allows lower temperatures in the system. Photo credit: Ray Wohlfarth. 

wolfarth slide 1
wolfarth slide 2
July 30, 2013
Ray Wohlfarth
KEYWORDS boiler / chillers / pipe / pipe system
Reprints
No Comments

A complaint building maintenance departments frequently hear is that the occupants are either too hot or too cold. In some instances, both complaints may come from the same room.

One of the systems with the most comfort complaints is a two-pipe system, which uses a supply pipe and a return pipe. In the heating season, the water in the pipe is heated with a boiler. In the cooling season, it is cooled with a chiller. During the peak of each season, this strategy works great.

The comfort complaints with this type of system come during fall or spring. During either  shoulder season, the building may require heat in the morning and cooling in the afternoon. The complaints occur due to the dead band of the temperature difference between the lowest hot-water and highest chilled-water temperature.

Standard efficiency boilers are designed to operate above 140º F. Operation below that temperature could cause the flue gases to condense, which can destroy the boiler and chimney. Conversely, most chillers cannot operate with temperatures above 90º F. (It’s always a good idea to  check with chiller manufacturers as to their temperature limits.)

So, we have a temperature difference of 50º between the heating and cooling setpoint. You have heard that saying about how long it takes for a watched pot to boil, right? That is nothing compared to the time it takes for the temperature inside a two-pipe system to drop from the minimum heating temperature to the maximum cooling temperature on a mild spring or fall day. It may be anywhere from several hours to a full day and by that time, we may need heat again.

When a local school with a two-pipe system had to replace its boilers, it had several choices. It could use a condensing boiler that could handle lower water temperatures. However, the economics of converting the heating plant to a condensing system were more than the owner had budgeted.

Another option was to use standard boilers with a three-way valve that allows lower temperatures in the system. I am not a fan of three-way valves because they could lead to thermal shock of the boiler if not installed correctly.

Thermal shock can cause cracked sections or tube leaks. It is caused by a wide temperature swing from the return to the supply piping. Most boilers were designed to handle a 20° to 25º F rise through the boiler. A three-way valve allows the water to bypass the boiler and be reset to a much lower temperature.

In many boiler control strategies, a one-to-one ratio is used. That means for every rise in outside temperature of 1° F, the system supply temperature will lower by 1°. The typical reset schedule will range from 180º F supply water at 0º F outside temperature to 120º F supply water at 60º F outside.

At the low end of that reset schedule, the supply temperature will be 120º F and the return temperature will be 100º F. When that cool 100º water is returned back to the hot boiler filled with 160º water, rapid expansion and contraction happens. The boiler literally shakes itself to death. Remember the advice from Dr. Egon Spengler in the movie “Ghostbusters,” “Don’t cross the streams!”

Another drawback to three-way valves is that many boiler manufacturers require the installation of an additional pump, which will pull water from the supply and inject it back to the return to avoid shocking the boiler. To me, this is like driving with the parking brake engaged.

 

IECC regs

If your state adheres to the International Energy Conservation Code, a couple regulations are required when controlling a two-pipe system. According to Section 503.4.3.2 of the 2009 International Energy Code:

• “... Systems that use a common distribution system to supply both heated and chilled water shall be designed to allow a dead band between changeover from one mode to the other of at least 150° F (8.30° C) outside air temperatures.”

A common setpoint arrangement is for the heat to be enabled below 50º F and air conditioning enabled above 65º F outside temperature. In between those two setpoints, most buildings use a combination of economizer operation for cooling and return air for heating.

• “... Provided with controls that will allow operation in one mode for at least four hours before changing over to the other mode.”

This may require some planning for the building owner to avoid complaints.

• “... Provided with controls that allow heating and cooling supply temperatures at the changeover point to be no more than 300° F (16.70° C) apart.”

In other words, the heating loop should be no warmer than 120º F if the chiller is designed for 90º F entering water temperature at the changeover point. This is below the typical lowest operating temperature of most standard-efficiency boilers.

With all these things to consider, the school’s engineer and I put our heads together and came up with another system that works perfectly. One of the standard-efficiency boilers we used is a combination boiler with an internal coil, which is traditionally used for low-temperature operation such as domestic hot water. This internal coil could handle temperatures from 60º F to 130º F without risk of thermal shock.

This is our first stage of the heating system. It would handle the water heating during the shoulder times of the year. This allows the loop temperature to drop to the 90º F that the chiller could handle. As the reset schedule requires warmer temperatures, the space-heating side of the combination boiler and the other boilers takes over and supplies water up to 180º F.

 The benefit to the client is that this system can change from heating to cooling in less than an hour. The result is comfort complaints are greatly reduced.  


HELPFUL LINKS:

  • Contact pme
  • Follow pme on Twitter!
  • Find pme on Facebook!

Subscribe to PM Engineer

Recent Articles by Ray Wohlfarth

Ray Wohlfarth: Troubleshooting hydronics

Ray Wohlfarth: The case for 2 psig

Ray Wohlfarth: Saying goodbye to industry legend, Bill Vallett, Sr.

Ray Wohlfarth: Understanding boiler controls

Why is the relief valve leaking?

Raynew_200

Ray Wohlfarth is the author of “Lessons Learned in a Boiler Room: A common-sense approach to servicing and installing commercial boilers.” In his spare time, he is president of Fire & Ice in Pittsburgh. Ray writes a monthly newsletter on commercial boilers. He can be reached at 412/343-4110 or ray@fireiceheat.com.

Related Articles

Controlling an existing hydronic boiler

The boiler gas train

Why did the boiler fail?

Boiler safety lessons

You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • Print & Digital Edition Subscriptions
  • eNewsletters
  • Online Registration
  • Subscription Customer Service

More Videos

Popular Stories

John Siegenthaler: Renewable Heating Design

John Siegenthaler: Pellet-fired boilers need thermal storage

Chis Wysoczanski, P.E.

2019 pme Mechanical Engineer of the Year: Fitzemeyer & Tocci's Chris Wysoczanski, P.E.

Julius Ballanco

Julius Ballanco: Not much changed at IAPMO

Ethan Grossman

Ethan Grossman: Getting dirty in engineering

Christoph Lohr

Christoph Lohr: Looking at the importance of personality metrics

Mechanical Engineer of the Year 2017 360

Events

December 30, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

View All Submit An Event

Products

2020 National Plumbing & HVAC Estimator

2020 National Plumbing & HVAC Estimator

See More Products

PME-PlumberEngineer2017_360.png


PME Rep Locator

PM Engineer Magazine

PME November 2019

2019 November

Check out the November 2019 edition of PME: PME's Mechanical Contractor of the Year, drainage trends, pellet-fired boilers, flue gas venting, and much more!
View More Create Account
  • Resources
    • List Rental
    • Reprints
    • eNewsletters
    • Contact Us
    • Privacy Policy
    • Editorial Submissions
  • Want More?
    • Subscribe
    • Industry Links
    • Connect
    • Survey And Sample
  • Plumbing Group
    • Plumbing & Mechanical
    • Supply House Times
  • Advertise
    • Advertise
    • Plan For 2020!

Copyright ©2019. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing