The design and construction of the Temecula Valley Hospital in Temecula, Calif., raises the bar for efficient, integrated delivery of health-care facilities. With a design and construction team made up of seven partners that signed a single integrated form of agreement, the five-story, 178,000-sq.-ft. hospital was completed from the ground-up for $157 million.
I’m 31 years old. That’s young in a numerical sense, but the creaks and groans I make getting out of bed tell a drastically different story. Still, at my “young” age, taking over as editor of pme is a daunting challenge. It’s a test I’ve enjoyed during the first six weeks on the job and one I look forward to six months from now and onward.
Trimble Robotic Total Station is an electronic instrument utilizing input from Autodesk Fabrication or Revit MEP drawings to automatically locate vital layout points as a building is under construction.
October 23, 2013
Trimble Robotic Total Station is an electronic instrument utilizing input from Autodesk Fabrication or Revit MEP drawings to automatically locate vital layout points as a building is under construction.
If there is a major sports stadium or arena that has been completed in recent years or is currently under construction, odds are M-E Engineers was or is involved in the project.