The design and construction of the Temecula Valley Hospital in Temecula, Calif., raises the bar for efficient, integrated delivery of health-care facilities. With a design and construction team made up of seven partners that signed a single integrated form of agreement, the five-story, 178,000-sq.-ft. hospital was completed from the ground-up for $157 million.
TRITON pipe-fusion system is a plastic pipe-welding solution that uses radio frequency electromagnetic technology to dramatically improve pipe-joining and testing times.
January 30, 2014
TRITON pipe-fusion system is a plastic pipe-welding solution that uses radio frequency electromagnetic technology to dramatically improve pipe-joining and testing times.