This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies
By closing this message or continuing to use our site, you agree to our cookie policy. Learn More
This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
PM Engineer logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
PM Engineer logo
  • Home
  • Magazine
    • Current Issue
    • Digital Edition
    • Archives
    • Radiant & Hydronics Report
    • Green Plumbing & Heating
    • Fire Protection & Design Special Section
    • NSF Design Special Section
    • Radiant Comfort Guide
    • PVF Outlook
    • Ad Index
  • Market Sectors
    • Green Plumbing
    • Green Mechanical Systems
    • Codes
    • Fire Protection
    • Radiant/Hydronics
    • Solar Thermal/Geothermal
    • Bath & Kitchen
    • Water Treatment
    • Technology
  • eNewsletter
    • Supply House Times e-news
    • pme eNewsletter Archives
    • Radiant & Hydronics eNews Archives
    • Bath & Kitchen Pro eNews Archives
    • Western Plumbing News Archives
    • Subscribe to Plumbing Group eNewsletters
  • Columnists
    • Julius Ballanco on Codes
    • Editor's Note
    • John Siegenthaler: Renewable Heating Design
    • Dan Holohan: Heating Help
    • Ray Wohlfarth: The Boiler Room
    • Jacqueline Wilmot: Fire Protection
    • Christoph Lohr: Professional Development Pipeline
    • Ethan Grossman: Water Cooler Conversations
    • Blog
  • Multimedia
    • PME AHR Expo 2019 Videos
    • pme Network Videos
    • eBook
    • Interactive Spotlights
    • Photo Gallery
    • Podcasts
    • Webinars
  • Products
  • More
    • History of Plumbing
    • Industry Calendar
    • Custom Content & Marketing Services
    • Classified Ads
    • Market Research
    • Bookstore
    • Continuing Education
  • Directories
    • B.I.G. Book
    • Rep Locator
  • Contact
    • Contact Us
    • Advertise
    • Editorial Submission Guidelines
Home » Working on the Same Page
Columnists

Working on the Same Page

October 1, 2011
Christine Swanson , PE, CFPS
Reprints
No Comments
Coordinating different fire protection disciplines is important.

Duct-type smoke detectors must install at a minimum length from the air handler and before any takeoffs. Photo courtesy of Honeywell Fire Systems, Americas.


Over the course of 21 years, I have been part of firms ranging from five to 3,500 employees.

Communication and coordination practices have to evolve with the changing size of the engineering firm or design team. However, regardless of the number of minds involved, the basics remain the same.

Coordination between disciplines during the design phase of a building is paramount to a better deliverable. At each phase of design, coordination meetings between all disciplines should be included in the project schedule. During such meetings, each discipline should have a chance to identify where its equipment and major systems exist, as well as what features might affect other disciplines. Some examples of coordination topics include fire resistance-rated shafts, smoke barriers and fire barriers. Highlight these items on the life safety drawings and discuss with your team. Identify all shafts, voids and “utility” rooms for use, as well as all utilities that are contained within, originate in or pass through such areas.

I have surveyed facilities where an empty shaft remained after construction with no access or penetrations on any floor, a two-hour fire resistance-rated enclosure and absolutely nothing within it. Regular coordination meetings can avoid such wastes of construction dollars, design time and space.

Attention to Detail

So where are stair-pressurization or smoke-management systems required? The architect, mechanical engineer and fire protection engineer should identify what types of penetration seal assemblies should exist and where. What other envelopes or barriers need to exist? Where do security layers exist? Have you implemented delayed-release door locks? Discuss those delineations with your team and highlight them on the life safety drawings.

Where are the air handlers located, how much airflow do they see, and where will duct-type smoke detectors be required in relation to each air handler? Show fire, fire and smoke, and smoke dampers on mechanical, electrical and fire alarm drawings. Notes on the drawings may include the following:
    1. The mechanical contractor shall install the duct-type smoke detectors (i.e. cut a hole in the duct and install the detector in accordance with the detector manufacturer’s listing and instructions).

    2. The fire alarm contractor shall install and connect signal wiring between the detector and the fire alarm panel.
Where power is necessary to actuate a motorized smoke and/or fire damper, the electrical contractor shall connect power to the motor actuator. Show power connection points and supply on the electrical drawings. Generally, motorized dampers in life safety systems install to fail-safe. For example, if power to the damper motor fails, the damper closes if it is in a fire or smoke barrier. Under normal conditions, the motor powers to keep the damper open.

Duct-Type Smoke Detectors

Too often, a system design drawing says, “Installed by others,” and “Provided by others.” This may be an expensive, overlooked line item - such as a duct smoke detector - installed in several locations. As most duct-type smoke detectors are proprietary with respect to the installed fire alarm system, the fire alarm contractor should provide such devices. 

Further, the fire alarm contractor needs to verify the duct-type smoke detector and its sampling tube is sized according to the duct cross-section at each discrete installation location. The fire alarm contractor shall locate where the duct detectors physically go in the duct, and the mechanical contractor shall cut the duct for the detector tube penetrations.

In an ideal situation, duct-type smoke detectors are all addressable. Upon smoke detection in any of the ducts within the air-handling system, the fire alarm panel sends a shutdown signal to a control module at the air handler. Duct-type smoke detectors must install at a minimum length from the air handler and before any takeoffs.  For example, install a duct detector at a distance equal to six times the larger cross-sectional dimension of the duct from the air handler.

Duct-type smoke detectors may sometimes register a false detection due to a puff of steam or dust in the air duct. When a smoke detector has air pass through it containing steam, dust or other particles that obscure the light source within the detector, the detector registers this to the fire alarm panel. Depending on how the fire alarm panel is programmed to handle this detection, an immediate alarm condition may occur, the detector may be registered as dirty under a supervisory condition at the panel or the panel may start a delay countdown and then check the detector status again.

Many times the obscuration clears during the delay, as it is only a temporary change in the air quality and not due to smoke from fire. This is common with the presence of steam humidification systems or in HVAC systems where there may be an instantaneous puff of fog in the duct due to conditioning systems cycling. False detections minimize if the duct detector is programmed with the fire alarm panel to have a delay and recheck of the detector status. 

You cannot foresee all functional system issues. Coordination of building systems design will not prevent all problems, but it will minimize the level of last-minute changes during construction.

Links

  • Follow pme on Twitter!
  • Contact PM Engineer

Subscribe to PM Engineer

Recent Articles by Christine Swanson

Prevent fire with a reduced-oxygen environment

Target Practice

Why didn't my fire sprinkler system work?

How old is this building?

Sleeping in a metal box

Cswanson-2011-january-photo-001_200

Christine Swanson, PE, FPE, CFPS, is a registered Professional Engineer in Fire Protection Engineering. She has been working in the industry of life safety and consumer product safety since 1990, with firms including Caterpillar, Underwriters Laboratories, Lockheed Martin, Federal Aviation Administration, Gage Babcock and Associates, Fire Safety Solutions, Clark Nexsen, and currently Hankins and Anderson Architects and Engineers. She can be reached at c.swanson@ha-inc.com or 757-213-6059.

Related Articles

Why didn't my fire sprinkler system work?

Fire Protection Engineers Are Always On The Job

Asset Protection

Prevent fire with a reduced-oxygen environment

Related Products

Classic Hydronics - How To Get The Most From Those Older Hot-Water Heating Systems

The Lost Art of Steam Heating Revisited

You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • Print & Digital Edition Subscriptions
  • eNewsletters
  • Online Registration
  • Subscription Customer Service

More Videos

Popular Stories

John Siegenthaler: Renewable Heating Design

John Siegenthaler: Pellet-fired boilers need thermal storage

Chis Wysoczanski, P.E.

2019 pme Mechanical Engineer of the Year: Fitzemeyer & Tocci's Chris Wysoczanski, P.E.

Julius Ballanco

Julius Ballanco: Not much changed at IAPMO

Ethan Grossman

Ethan Grossman: Getting dirty in engineering

Christoph Lohr

Christoph Lohr: Looking at the importance of personality metrics

Mechanical Engineer of the Year 2017 360

Events

December 30, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

View All Submit An Event

Products

2020 National Plumbing & HVAC Estimator

2020 National Plumbing & HVAC Estimator

See More Products

PME-PlumberEngineer2017_360.png


PME Rep Locator

PM Engineer Magazine

PME November 2019

2019 November

Check out the November 2019 edition of PME: PME's Mechanical Contractor of the Year, drainage trends, pellet-fired boilers, flue gas venting, and much more!
View More Create Account
  • Resources
    • List Rental
    • Reprints
    • eNewsletters
    • Contact Us
    • Privacy Policy
    • Editorial Submissions
  • Want More?
    • Subscribe
    • Industry Links
    • Connect
    • Survey And Sample
  • Plumbing Group
    • Plumbing & Mechanical
    • Supply House Times
  • Advertise
    • Advertise
    • Plan For 2020!

Copyright ©2019. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing