The objective of PDI is to promote the advancement of engineered plumbing products through publicity, public relations, research, and standardization of product requirements.
With Americans spending more money annually on eating fast food than on higher education, our appetite for fried foods and our love affair for eating out will continue to fuel the grease goblins in our sanitary sewer infrastructure.
Many areas in our modern buildings require floor drains that must satisfy high sanitation requirements and still conform to the aesthetics of the building, so the industry has developed a complete line of floor drains to meet these needs.
This article will review some of the fundamental system requirements, design considerations and tips for working with the local fire department when designing sprinkler systems in multi-tenant buildings.
Here's how Gastite flexible gas piping was used to ignite a bronze, flame-spewing statue at the entrance to Doak Campbell Stadium on the campus of Florida State University in Tallahassee, FL.
There is a growing awareness of the need to change the ways buildings are built such that we create buildings that improve the economic, social and environmental performance compared to buildings of the past.
Faced with a requirement to be sprinklered before its chapter house could be occupied, Alpha Xi Delta Fraternity, Inc. chose to retrofit using BlazeMaster CPVC pipe because of its cost advantages, easy installation and corrosion resistance.